EAHOME Dog Training Lead Long Rope Cotton Nylon Webbing Recall Obedience Line Leash for Pet Long Lead For Large, Medium and Small Dogs – Great for Training, Play, Camping, or Backyard(5M)


£9.99
Apr 18,2021 19:02:15 UTC **CLICK BUY NOW FOR UPDATED PRICE**


Product Description

DOG DOG

The brand concept of Gumiho’s Dog Leash

Paying for nothing but value.Gumiho strives to reduce the links that do not produce use value.We really

are just like you and your buddies: Obsessed with dogs.

The Best Cost-effective, Durable Training Leashes

Features:

✔lightweight and easy to coil and carry

✔The polypropylene fiber material is much more durable than cotton leashes

✔The stitching is reinforced and the nickel-plated clip swivels to resist twisting

✔Allows you to teach your dog recalls and other obedience skills

✔Strong enough for outdoor small, medium and large dogs controlling

dog leashdog leash

dog leashdog leash

Great for puppy, medium and large dogs, suitable for Husky, Golden Retriever, Labrador, Teddy, Chihuahuas, Cocker Spaniel, French Bulldog, Beagle, Pit Bull, Poodle all small medium and large breed.

After-sale

Gumiho’s product has 18-month for quality-problem, ensures your long-term enjoyment of your purchase.

If you have any questions,we will help you solve the problem within 24 hours.

black leash

black leash

long doh lead

long doh lead

10 m dog lead

10 m dog lead

By designing our products in the field, with heat, cold, rain, snow, dust, mud, and wind in mind,Gumiho has become the most recognized brand in the electronic tracking and training categories.

Form memories:This rope is suitable for training your puppy to act from their memories. It trains the puppy to get used to the farthest distance from you, so when you move, memories will help it keep up to a certain distance.

Train the puppies to follow your instructions: This rope is suitable for training the puppy to focus on you, also allowing it to run agilely without getting out of your sight or control. To train it and make it follow your instructions to stop and recall

GumihoGumiho

Size:

3M & 5M: Great for exploratory walking, potty with shorter range.

10M : Close ball play, using the potty with freedom. freedom to romp

Product Name

3M Dog leash

10M Dog leash

Training Whistle

【High Quality】Made from strong nylon, Quality durable metal hook. Easy to wear and remove,Help you take your dog easily
【New Design】Trigger hook for easy attachment to your dog’s own collar, rotated by 360 degree allows your pet to play more secure. Allows you to teach your dog recalls and other obedience skills
【Suitable For】Teddy, Chihuahua, Miniature pinscher, Schnauzer, Samo, Husky, Golden Retriever, German Shepherd , Rottweiler , Alaska , Tibetan mastiff and other pets
Package】1 x Rope dog lead